The Feather River Canyon Route Add-on for Train Simulator Classic has 10 achievements.
Awarded for driving the GE U30B WP a distance of 30 miles.
Awarded for driving the GE U30B WP at a speed of 45mph (72.42km/h).
Awarded for driving the GE U30B WP on a 1% gradient.
Awarded for completing scenario “[U30B] 1. Keddie Consignment: Part 1” with a score of 750 points.
Awarded for completing scenario “[U30B] 4. Crescent Mills to Keddie” with a score of 950 points.
Awarded for completing scenario “[U30B] 5. Oroville Bound - Part 1” with a score of 800 points.
Awarded for completing scenario “[U30B] 7. Oroville Bound - Part 3” with a score of 1000 points.
Awarded for completing 5 out of 15 Career scenarios in this DLC pack.
Awarded for completing 15 out of 15 Career scenarios in this DLC pack.
Awarded for completing all Career scenarios in this DLC pack with a score of 5600 points.